DELTA K EXPLOSIVE ENGINEERING SYSTEMS LIMITEDActive

Company number 03583796Private limited companyIncorporated 1998

Key figures

−£78,898-0.9%
Net assets 2024/25
-100 k-75 k-50 k-25 k02019/202020/212021/222022/232023/242024/25

Like most small UK companies, DELTA K EXPLOSIVE ENGINEERING SYSTEMS LIMITED does not publish a profit and loss account in its latest accounts. The figures below come from the balance sheet.

Ratios

2024/25
Balance sheet structure
Current assetsFixed assetsLiabilitiesNet assets
0100 k200 k2019/202020/212021/222022/232023/242024/25
Filed accounts2019/20–2024/25
2020/212021/222022/232023/242024/25
Cash at bank and in hand18,60113,6479,7243,61111,852
Total assets97,97875,62859,35360,59773,979
Total liabilities————152,877
Net assets / total equity-65,772-65,888-80,125-78,193-78,898
Average number of employees11111

A dash (—) means no accounts were filed for that year or the item is not in the accounts; 0 is a zero stated in the accounts. Small companies usually file only a balance sheet, so the profit and loss account is often missing.

Summary: DELTA K EXPLOSIVE ENGINEERING SYSTEMS LIMITED

Company

DELTA K EXPLOSIVE ENGINEERING SYSTEMS LIMITED is a private limited company registered with Companies House under company number 03583796. It was incorporated on 18 Jun 1998. Its status is active. The registered office is in Sevenoaks (TN13). Its nature of business (SIC 2007) is other research and experimental development on natural sciences and engineering (72190).

Accounts

The latest accounts in the database are for 2024/25 (period ending 30 Jun 2025); the company files abridged accounts (unaudited). Net assets were −£78,898, down 0.9% on the previous year. Cash at bank and in hand was £11,852. Total assets were £73,979 and total liabilities £152,877. The company had an average of 1 employee. Figures are available for 6 financial years (2019/20–2024/25).

Control and charges

One person with significant control is registered.

Filing deadlines

The next accounts are due by 31 Mar 2027. The next confirmation statement is due by 9 Aug 2027.