GEOTHERMAL ENGINEERING LIMITED
ActiveKey figures
Like most small UK companies, GEOTHERMAL ENGINEERING LIMITED does not publish a profit and loss account in its latest accounts. The figures below come from the balance sheet.
Ratios
2025Sector comparison
SIC 35110Where the company stands among the 10,500 active companies whose first SIC code is 35110 (Production of electricity).
- ORSTED POWER (UK) LIMITED£5.7bn
- EDF ENERGY NUCLEAR GENERATION LIMITED£4.1bn
- CENTRICA PLC£3.5bn
- EDF ENERGY LIMITED£2.5bn
- DRAX POWER LIMITED£2.4bn
- RWE GENERATION UK PLC£2.1bn
- RWE RENEWABLES UK SWINDON LIMITED£1.7bn
- VATTENFALL WIND POWER LTD£1.7bn
- LIGHTSOURCE TITAN LIMITED£1.5bn
- EDF ENERGY NUCLEAR GENERATION GROUP LIMITED£993m
Positions are approximate. Figures come from each company's latest accounts; money and employee figures are compared only with companies that filed accounts in pounds for a period ending in the last two and a half years and are not dormant, so those groups are smaller than 10,500. The line on each bar marks the median.
Summary: GEOTHERMAL ENGINEERING LIMITED
What kind of company is it?
GEOTHERMAL ENGINEERING LIMITED is a private limited company registered with Companies House under company number 06663174. It was incorporated on 4 Aug 2008. Its status is active. The registered office is in Redruth (TR16). Its nature of business (SIC 2007) is production of electricity (35110), construction of utility projects for electricity and telecommunications (42220), test drilling and boring (43130).
How is the company doing financially?
The latest accounts in the database are for 2025 (period ending 31 Dec 2025); the company files small company accounts (filleted). Net assets were £20,548,113, up 749.4% on the previous year. Cash at bank and in hand was £1,464,753. Total assets were £24,721,217 and total liabilities £4,173,104. The company had an average of 0 employees. Figures are available for 6 financial years (2020–2025).
How does it compare with similar companies?
Compared with 10,500 active companies whose first SIC code is 35110: By net assets it ranks higher than 95% of them (median £25,452). By total assets it ranks higher than 92% of them (median £775,661). By cash it ranks higher than 91% of them (median £84,971). By number of employees it is around the median of them (0). It is older than 93% of them (median age 8.6 years).
Does it supply the public sector?
The company is named as the supplier in one public contract award notice, from MINISTRY OF DEFENCE. Contracts awarded to it alone have a combined published value of £50k. It is recorded as the recipient of 11 central government grants worth £2m, mainly from Department for Science, Innovation and Technology.
What do public registers and reports show?
HMRC lists it as an importer of goods, mainly machinery, coated textiles.
Who runs and controls the company?
The company has 4 current directors. 2 persons with significant control are registered. 1 of 3 registered charges are outstanding.
When are its next filings due?
The next accounts are due by 30 Sep 2027. The next confirmation statement is due by 14 Aug 2027.
Filed accounts2020–2025
| 2021 | 2022 | 2023 | 2024 | 2025 | |
|---|---|---|---|---|---|
| Cash at bank and in hand | 7,278 | 4,427 | 580,331 | 30,735 | 1,464,753 |
| Total assets | 1,637,457 | 2,296,032 | 4,208,010 | 3,666,732 | 24,721,217 |
| Total liabilities | 5,799,544 | 8,078,988 | 6,237,327 | 6,830,692 | 4,173,104 |
| Net assets / total equity | -4,162,087 | -5,782,956 | -2,029,317 | -3,163,960 | 20,548,113 |
| Average number of employees | 5 | 9 | 9 | 13 | 0 |
A dash (—) means no accounts were filed for that year or the item is not in the accounts; 0 is a zero stated in the accounts. Small companies usually file only a balance sheet, so the profit and loss account is often missing.
Public contracts
1 contractGEOTHERMAL ENGINEERING LIMITED is named as a supplier in 1 public contract award notice from MINISTRY OF DEFENCE. Its published value is £50k.
- Geothermal Feasibility StudyMINISTRY OF DEFENCE · £50,000
From contract award notices on Contracts Finder (since 2016) and Find a Tender (since 2021), published by the Cabinet Office under the Open Government Licence v3.0. Values are as published by the buyer and usually cover the whole contract term; the total leaves out awards shared between several suppliers, where the published figure is a ceiling for all of them, placeholder values and single figures of £1 billion or more. Contracts below the publication thresholds and those of devolved buyers that publish elsewhere are not included.
Government grants
11 grantsGEOTHERMAL ENGINEERING LIMITED is recorded as the recipient of 11 central government grants since 2022, together worth £2m.
- Department for Science, Innovation and Technology
- 7 grants · £1.9m
- Department for Business, Energy and Industrial Strategy
- 4 grants · £120.4k
- Scale Up of Direct Lithium Production from Deep Geothermal Fluid in CornwallDepartment for Science, Innovation and Technology · £1,728,497 · UKRI-APC-Scheme
- Piloting Underground Storage of Heat In geoThermal reservoirsDepartment for Science, Innovation and Technology · £67,188 · UKRI - HEG - Scheme
- Piloting Underground Storage of Heat In geoThermal reservoirsDepartment for Science, Innovation and Technology · £22,657 · UKRI - HEG - Scheme
- SAPHEA - Developing a single access point for the market uptake of geothermal energy use in multivalent heating and cooling networks across EuropeDepartment for Science, Innovation and Technology · £18,438 · UKRI - HEG - Scheme
- SAPHEA - Developing a single access point for the market uptake of geothermal energy use in multivalent heating and cooling networks across EuropeDepartment for Science, Innovation and Technology · £11,218 · UKRI - HEG - Scheme
Show 6 more
- CRM-geothermal: Raw materials from geothermal fluids: occurrence, enrichment, extractionDepartment for Science, Innovation and Technology · £30,615 · UKRI - HEG - Scheme
- CRM-geothermal: Raw materials from geothermal fluids: occurrence, enrichment, extractionDepartment for Science, Innovation and Technology · £31,422 · UKRI - HEG - Scheme
- Feasibility study to create the business case for the purchase and installation of a commercial scale geothermal Direct Lithium Extraction unit in CornwallDepartment for Business, Energy and Industrial Strategy · £68,188 · UKRI - Innovate UK - Scheme 22/23
- CRM-geothermal: Raw materials from geothermal fluids: occurrence, enrichment, extractionDepartment for Business, Energy and Industrial Strategy · £30,161 · UKRI - HEG - Scheme 22/23
- SAPHEA - Developing a single access point for the market uptake of geothermal energy use in multivalent heating and cooling networks across EuropeDepartment for Business, Energy and Industrial Strategy · £10,977 · UKRI - HEG - Scheme 22/23
- Piloting Underground Storage of Heat In geoThermal reservoirsDepartment for Business, Energy and Industrial Strategy · £11,084 · UKRI - HEG - Scheme 22/23
From the Government Grants Register published by the Cabinet Office (financial years 2016/17 onwards, Open Government Licence v3.0). It covers grants from central government departments and their agencies where the register states the recipient's company number and the recipient name matches this company; grants from local authorities, lottery distributors and devolved governments are not included.
Registers and licences
Listed by HMRC as an importer of goods in 3 of the last 12 months on record, most recently August 2026. Main goods: machinery and coated textiles.
From HMRC's monthly lists of importers and exporters. Traders can ask to be left off the lists, so absence does not mean a company does not trade.
Sources: Charity Commission for England and Wales, Care Quality Commission, Home Office and HM Revenue & Customs, under the Open Government Licence v3.0. Entries marked ‡ come from lists that do not state a company number and were linked by an exact match on the registered name.
History
30 events- Financial year 2025 endedAccounts: net assets £20.5m, 0 employees
- Antony John WILSON resignedDirector
- David POE resignedDirector
- David Vernon BRIDGLAND resignedDirector
- Susan Mary KENNINGTON resignedSecretary
- Simon James ELLISON appointedSecretary
- Andre An-Chun CHENG appointedDirector
- Matthew Thomas CLAYTON appointedDirector
Earlier events (22)
- Cx Geothermal Ltd registered as a person with significant control
- Thrive Renewables Plc registered as a person with significant control
- Mr Ryan Law ceased to be a person with significant control
- Financial year 2024 endedAccounts: net assets −£3.2m, 13 employees
- Anish Nagin PATEL resignedDirector
- Jules VAN LIMBORGH appointedDirector
- Jonathan BEYNON resignedDirector
- Antony John WILSON appointedDirector
- Financial year 2023 endedAccounts: net assets −£2m, 9 employees
- Anish Nagin PATEL appointedDirector
- Financial year 2022 endedAccounts: net assets −£5.8m, 9 employees
- Financial year 2021 endedAccounts: net assets −£4.2m, 5 employees
- Financial year 2020 endedAccounts: net assets −£4.2m, 2 employees
- Peter LEDINGHAM resignedDirector
- Mr Ryan Law registered as a person with significant control
- Jonathan BEYNON appointedDirector
- Peter LEDINGHAM appointedDirector
- David POE appointedDirector
- David Vernon BRIDGLAND appointedDirector
- Ryan LAW appointedDirector
- Susan Mary KENNINGTON appointedSecretary
- Company incorporatedPrivate limited company
Dates as recorded at Companies House: incorporation, name changes, officer appointments and resignations, current and former persons with significant control, and the end of each financial year with figures in the database.