NV QUALITY CONSTRUCTION LTDActive

Company number 11344634Private limited companyIncorporated 2018

Key figures

£336,234-14.5%
Net assets 2024/25
+704.1%
Average annual growth 2019/20–2024/25
0100 k200 k300 k400 k2019/202020/212021/222022/232023/242024/25

Like most small UK companies, NV QUALITY CONSTRUCTION LTD does not publish a profit and loss account in its latest accounts. The figures below come from the balance sheet.

Ratios

2024/25
Balance sheet structure
Current assetsFixed assetsLiabilitiesNet assets
0500 k1 m1.5 m2019/202020/212021/222022/232023/242024/25
Filed accounts2019/20–2024/25
2020/212021/222022/232023/242024/25
Cash at bank and in hand——264,93448,84638,183
Total assets——-297,113926,4881,436,423
Total liabilities——14,432533,0451,100,189
Net assets / total equity1010227,085393,443336,234
Average number of employees33-322

A dash (—) means no accounts were filed for that year or the item is not in the accounts; 0 is a zero stated in the accounts. Small companies usually file only a balance sheet, so the profit and loss account is often missing.

Summary: NV QUALITY CONSTRUCTION LTD

Company

NV QUALITY CONSTRUCTION LTD is a private limited company registered with Companies House under company number 11344634. It was incorporated on 3 May 2018. Its status is active. The registered office is in Harrow (HA3). Its nature of business (SIC 2007) is construction of domestic buildings (41202), construction of roads and motorways (42110).

Accounts

The latest accounts in the database are for 2024/25 (period ending 31 May 2025); the company files abridged accounts (unaudited). Net assets were £336,234, down 14.5% on the previous year. Cash at bank and in hand was £38,183. Total assets were £1,436,423 and total liabilities £1,100,189. The company had an average of 2 employees. Figures are available for 6 financial years (2019/20–2024/25).

Control and charges

One person with significant control is registered.

Filing deadlines

The next accounts are due by 28 Feb 2027. The next confirmation statement is due by 1 Mar 2027.