BALFOUR BEATTY CONSTRUCTION LIMITED
ActiveNo accounts in digital format (iXBRL) since 2019. Paper or PDF accounts are available at Companies House.
Sector comparison
SIC 41201Where the company stands among the 33,180 active companies whose first SIC code is 41201 (Construction of commercial buildings).
- BARRATT REDROW PLC£7.9bn
- BDW TRADING LIMITED£3.9bn
- MILLER HOMES LIMITED£1.3bn
- MOBAY AND COMPANY LIMITED£440.4m
- CANARY WHARF RETAIL FINANCE LIMITED£327.9m
- MORGAN SINDALL CONSTRUCTION & INFRASTRUCTURE LTD£306.2m
- WATKIN JONES & SON LIMITED£247.6m
- KIER CONSTRUCTION LIMITED£215.7m
- SPRINGFIELD PROPERTIES PLC£179m
- OVERBURY PLC£176.2m
Positions are approximate. Figures come from each company's latest accounts; money and employee figures are compared only with companies that filed accounts in pounds for a period ending in the last two and a half years and are not dormant. The line on each bar marks the median.
Summary: BALFOUR BEATTY CONSTRUCTION LIMITED
What kind of company is it?
BALFOUR BEATTY CONSTRUCTION LIMITED is a private limited company registered with Companies House under company number SC106247. It was incorporated on 24 Aug 1987. Its status is active. The registered office is in Holytown (ML1). Its nature of business (SIC 2007) is construction of commercial buildings (41201).
How does it compare with similar companies?
Compared with 33,180 active companies whose first SIC code is 41201: It is older than 96% of them (median age 4.7 years).
Does it supply the public sector?
The company is named as a supplier in 104 public contract award notices from 9 public sector buyers since 2020. Contracts awarded to it alone have a combined published value of £111.9m. Its most frequent buyer is National Highways (68 contracts). 4 of the awards are shared with other suppliers, typically framework agreements.
Who runs and controls the company?
One person with significant control is registered.
When are its next filings due?
The next accounts are due by 30 Sep 2027. The next confirmation statement is due by 26 Apr 2027.
Control structure
Click a box to see its connections.
From the Companies House PSC register: who controls BALFOUR BEATTY CONSTRUCTION LIMITED and which UK companies it controls. The register gives bands (for example 25–50% of shares or votes), not exact holdings. A company can be opened only when its number and name match the register; individuals and overseas owners are shown by name only.
Public contracts
104 contractsBALFOUR BEATTY CONSTRUCTION LIMITED is named as a supplier in 104 public contract award notices from 9 public sector buyers since 2020. The 99 contracts awarded to it alone with a published value add up to £111.9m. 4 awards are shared with other suppliers and not counted in that total.
- National Highways
- 68 contracts · £9.1m
- National Highways Limited
- 28 contracts · £4m
- Highways England
- 2 contracts · £30.5m
- Department of Health and Social Care
- 1 contract · £67m
- TEES VALLEY COMBINED AUTHORITY
- 1 contract · £1.3m
- HRE - ETC/146 - Edinburgh - Carlisle - Ale Water Viaduc‡National Highways Limited · £187,614 · runs until Mar 2027
- HRE - EFL/40 - St Andrews - Leven (East Fife) - Waterless Railway Bridge‡National Highways Limited · £88,476 · runs until Mar 2027
- HRE - AFS/20 - Aviemore to Forres - Castle Grant‡National Highways Limited · £162,058 · runs until Mar 2027
- HRE - IMD/373 - Macduff - Inveramsay - Culsalmond - Turnpike‡National Highways Limited · £93,175 · runs until Mar 2027
- HRE - RWR/61 - Berwickshire Branch - Leaderfoot Viaduct‡National Highways Limited · £38,186 · runs until Mar 2027
Show 95 more
- HRE - KLM/68A - Elderslie - Greenock Princes Pier - Union Street‡National Highways Limited · £11,984 · runs until Mar 2027
- HRE - KLM/63RWS - Elderslie - Greenock Princes Pier‡National Highways Limited · £247,275 · runs until Mar 2027
- HRE - GCL/31 - Kirklee - Finnieston (Kelvin Bridge Branch) - Kelvinbridge Tunnel / Kelvingrove Tunnel‡National Highways Limited · £13,095 · runs until Mar 2027
- HRE - KLO/38 - Kelso Branch - Duddo Burn‡National Highways Limited · £82,463 · runs until Mar 2027
- HRE - BGN/5 - Bridgeton Central - High Street - Bridgeton Cross Tunnel‡National Highways Limited · £37,605 · runs until Nov 2026
- HRE - CJD/203 - Dumfries - Stranraer - Glen Luce Viaduct - Water of Luce‡National Highways Limited · £32,534 · runs until Mar 2027
- HRE - GCL/38 - Kirklee - Finnieston (Kelvin Bridge Branch) - Botanic Garden Station‡National Highways Limited · £97,002 · runs until Mar 2027
- HRE - Dalry - Kilmarnock - Annick Water - DAK/87‡National Highways Limited · £62,409 · runs until Mar 2027
- HRE - AGB/2 - Gullane to Longniddry - Aberlady Public Road‡National Highways Limited · £82,952 · runs until Mar 2027
- HRE - Elderslie - Greenock Princes Pier - Union Street - KLM/68‡National Highways Limited · £52,009 · runs until Mar 2027
- HRE - BGN/1RWW - Bridgeton Central - High Street‡National Highways Limited · £37,067
- HRE - ETC265 River Eden Viaduct‡National Highways Limited · £2,341,921 · runs until Nov 2027
- HRE - KLO/64 - Kelso Branch - Teviot Viaduct (Roxburgh Viaduct)‡National Highways Limited · £10,707
- HRE - LAD/5 - Yorkhill and Bowling (L&D) - River Kelvin Bridge‡National Highways Limited · £25,415
- HRE - EVP/4 - Polton - Hardengreen - Lasswade Viaduct‡National Highways Limited · £34,342
- HRE - GBA/4A - Gorbals Junction (GB & K)‡National Highways Limited · £16,043
- HRE - GBA/1 - Gorbals Junction (GB & K) - Gorbals Station‡National Highways Limited · £34,403
- HRE - Dumfries - Stranraer - Over Banks Farm Road - CJD/19‡National Highways Limited · £19,289
- HRE - DEY/1 - Denny - Larbert‡National Highways Limited · £106,631
- HRE - Elderslie - Greenock Princes Pier - Kilmacolm Road - KLM/53A‡National Highways Limited · £35,771
- HRE - KAS/176 - Stanley Jn - Kinnaber Jn. (via Forfar) - Alyth Junction‡National Highways Limited · £17,892
- HRE - SWI/12 - Swinehill Branch (Stonehouse - Dalserf) - Netherburn Road or Ashgillhead Road‡National Highways Limited · £25,733
- HRE - Doura - Kilwinning Lochlibo Road - DOA/12/C1‡National Highways Limited · £14,125
- HRE - AGB/3 - Gullane to Longniddry - Luffness Mains‡National Highways · £249,807
- Polton - Hardengreen - EVP/3L‡National Highways · £18,969
- HRE - Douglas & Muirkirk - Bonnington‡National Highways · £32,321
- HRE - Gullane to Longniddry - Luffness Mains‡National Highways · £249,580
- HRE - CLOSED BRANCH LINES MINOR WORKS - AGB/3 - REPLACEMENT BRIDGE DECK‡National Highways · £177,959
- HRE - Kelso Branch - Sprouston‡National Highways · £52,648 · runs until Mar 2027
- HRE - CLOSED BRANCH LINES MINOR WORKS - Kelso Branch - Kinsquater - KLO/50‡National Highways · £52,648 · runs until Mar 2027
- DAK/75/C1 - Dalry - Kilmarnock‡National Highways · £50,119 · runs until Mar 2027
- HRE - Dumfries - Stranraer - Victoria Place‡National Highways · £47,872 · runs until Mar 2027
- HRE - DAK/77/C1 - Dalry - Kilmarnock‡National Highways · £62,325 · runs until Mar 2027
- HRE - CLOSED BRANCH LINES MINOR WORKS - KCT/11 - REPAIRS IDENTIFIED IN THE DETAILED EXAMINATION DATED 27.11.23‡National Highways · £48,919 · runs until Mar 2027
- HRE - Bridgeton Cross and Carmyle - London Road Tunnel‡National Highways · £3,760,300
- HRE - CLOSED BRANCH LINES MINOR WORKS - AGB/3 - BIRD PREVENTION AWAY MEASURES‡National Highways · £12,508
- CLOSED BRANCH LINES MINOR WORKS - SML/5B - HIDDEN BEARING ZONE EXAMINATION‡National Highways · £25,301
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/61 - INVASIVE SPECIES TREATMENT‡National Highways · £17,756
- HRE - CLOSED BRANCH LINES MINOR WORKS - AFS/20 - ADVANCE ECO CHECKS/PEA AT 27 SITES‡National Highways · £51,422
- HRE - CLOSED BRANCH LINES MINOR WORKS - DLR/63 - REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 16.11.21‡National Highways · £87,291
- Bridge RepairsTEES VALLEY COMBINED AUTHORITY · £1,250,000
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/63 - REPAIR DEFECTS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 13.04.22‡National Highways · £249,872
- CLOSED BRANCH LINES MINOR WORKS - IMD/421 - REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 03.08.22‡National Highways · £198,749
- CLOSED BRANCH LINES MINOR WORKS - DMB/35 - REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 28.11.22‡National Highways · £44,251
- HRE - CLOSED BRANCH LINES MINOR WORKS - AGB/3 - SITE INVESTIGATION‡National Highways · £52,977
- HRE - CLOSED BRANCH LINES MINOR WORKS - CBB/10 - HIDDEN BEARING ZONE INVESTIGATION‡National Highways · £21,091
- HRE - CLOSED BRANCH LINES MINOR WORKS - DAS2/28 - EMERGENCY PARAPET REPAIRS‡National Highways · £27,156
- HRE - CLOSED BRANCH LINES MINOR WORKS - LPJ2/2 - REPLACE ACCO COVERS AND GLUE IN POSITION‡National Highways · £15,527
- CLOSED BRANCH LINES MINOR WORKS - KLM/63 - REPAIR DEFECTS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 13.04.22 BETWEEN CH.009 AND THE NW PORTAL‡National Highways · £212,435
- CLOSED BRANCH LINES MINOR WORKS - KLM/62 - REPAIR DEFECTS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 09.01.23‡National Highways · £105,053
- CLOSED BRANCH LINES MINOR WORKS - BOT/40 - REPAIRS IDENTIFIED IN VISIAL EXAMINATION REPORT DATED 19.03.24.‡National Highways · £12,122
- CLOSED BRANCH LINES MINOR WORKS - DLR/69 - INVESTIGATION WORKS‡National Highways · £20,388
- CLOSED BRANCH LINES MINOR WORKS - ANB/04 - CARRY OUT REPAIRS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 25.10.22‡National Highways · £87,739
- CLOSED BRANCH LINES MINOR WORKS - PBB/41 - CARRY OUT REPAIRS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 23.11.21‡National Highways · £59,452
- HRE - CLOSED BRANCH LINES MINOR WORKS - KML/63RWS - STAGE 2: SITE INVESTIGATION AND DESIGN‡National Highways · £85,609
- HRE - CLOSED BRANCH LINES MINOR WORKS - WLR/23A - CARRY OUT REPAIRS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 16.11.21‡National Highways · £48,265
- CLOSED BRANCH LINES MINOR WORKS - KLM/67 - REPAIRS IDENTIFIED IN DE DATED 12.04.22‡National Highways · £31,765
- HRE - CLOSED BRANCH LINES MINOR WORKS - ACL/25 - REPAIRS TO WEST PARAPET AND ACL/23 FENCE‡National Highways · £21,691
- HRE - CLOSED BRANCH LINES MINOR WORKS - DAK/84 - REPAIRS IDENTIFIED IN DE DATED 08.02.23.‡National Highways · £84,024
- HRE - CLOSED BRANCH LINES MINOR WORKS - PBB/6 - SOUTHWEST WING WALL REPAIRS‡National Highways · £48,812
- HRE - CLOSED BRANCH LINES MINOR WORKS - LAD/2 - UNBLOCK AIR VENT AT STOBCROSS PORTAL‡National Highways · £18,993
- HRE -CLOSED BRANCH LINES MINOR WORKS - KLM/67B - REPAIRS IDENTIFIED IN DE DATED 20.08.21‡National Highways · £27,962
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/52: REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORTS DATED 05.07.23 AND HIDDEN SHAFT SURVEY‡National Highways · £80,183
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/64: REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORTS DATED 13.04.22 AND TRIAL APPLICATION OF ELASTOMER…‡National Highways · £139,301
- HRE - RLB/1 - Riddings Viaduct‡National Highways · £822,332
- HRE - CLOSED BRANCH LINES MINOR WORKS - DAS2/20 - SITE INVESTIGATION TO ASSIST JACOBS.‡National Highways · £92,377
- HRE - CLOSED BRANCH LINES MINOR WORKS - KPB/16 - CARRY OUT REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 12.05.21.‡National Highways · £107,010
- HRE - CLOSED BRANCH LINES MINOR WORKS - SWI/10 - FEASIBILITY STUDY‡National Highways · £12,180
- CLOSED BRANCH LINES MINOR WORKS - SVE/5 - REPAIRS IDENTIFIED IN DE REPORT DATED 05/12/19 AND VE DATED 25/07/23.‡National Highways · £39,167
- CLOSED BRANCH LINES MINOR WORKS - MIB/20 - REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORT DATED 01.08.22‡National Highways · £36,070
- CLOSED BRANCH LINES MINOR WORKS - MIB/11 - REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORT DATED 03.08.22‡National Highways · £37,230
- HRE - CLOSED BRANCH LINES MINOR WORKS - ELC/914 - CARRY OUT REPAIRS IDENTIFIED IN DETAILED EXAMINATION DATED 11.05.21‡National Highways · £43,532
- Project: pro_17955 - HRE - CLOSED BRANCH LINES MINOR WORKS - KVB/26 - REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORT DATED 11.04.23‡National Highways · £35,799
- HRE - CLOSED BRANCH LINES MINOR WORKS - AYH/1 - FENCING REPAIRS‡National Highways · £15,165
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/61: REPAIR DEFECTS IDENTIFIED IN THE DETAILED EXAMINATION REPORTS DATED 13.04.23‡National Highways · £59,839
- HRE - CLOSED BRANCH LINES MINOR WORKS - AFS/51 - REPAIRS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 23.05.23‡National Highways · £79,343
- HRE - CLOSED BRANCH LINES MINOR WORKS - BGN/3L - REMOVE FLY TIPPING‡National Highways · £17,022
- HRE - CLOSED BRANCH LINES MINOR WORKS - OBA/8 - FEASIBILITY STAGE 1A OF REPAIR WORKS‡National Highways · £29,793
- HRE - CLOSED BRANCH LINES MINOR WORKS - OBA/13 - PHASE 1 OF WORKS TO REPAIR DEFECTS IDENTIFIED IN THE DE REPORT DATED 14.02.23‡National Highways · £26,745
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/65 - REPAIRS TO DEFECTS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 12/04/22‡National Highways · £52,825
- HRE - CLOSED BRANCH LINES MINOR WORKS - WCP/11 - FENCING REPAIRS‡National Highways · £13,371
- HRE - CLOSED BRANCH LINES MINOR WORKS - GBA/5 - SITE INVESTIGATION (PHASE 2) TO SUPPORT JACOBS DESIGN‡National Highways · £206,525
- HRE - CLOSED BRANCH LINES MINOR WORKS - WCP/5 - REMOVAL OF FLY TIPPING‡National Highways · £16,521
- HRE - CLOSED BRANCH LINES MINOR WORKS - GBA/4 - SITE INVESTIGATION (PHASE 2) TO SUPPORT JACOBS DESIGN‡National Highways · £191,454
- Project: pro_18238 - HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/60 - BIODIVERSITY NET GAIN COLLABORATIVE RESEARCH PROJECT - PHASE 2‡National Highways · £132,996
- Project: pro_17355 - HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/63RWS - SURVEY AND SITE INVESTIGATION SCOPE TO REMEDY LAND SLIP‡National Highways · £19,073
- HRE - CLOSED BRANCH LINES MINOR WORKS - AYH/1 - VEHICLE IMPACT REPAIRS‡National Highways · £15,312
- SCC APC A320 HIF (Housing Infrastructure Fund) Scheme Expression of Interest‡Surrey County Council
- CLOSED BRANCH LINES MINOR WORKS - KLM/64RNE - VARIOUS REPAIRS TO WALLS KLM/64 RNE AND RNW IDENTIFIED IN DETAILED EXAMINATION REPORTS DATES 23.03.22‡National Highways · £172,491
- HRE - CLOSED BRANCH LINES MINOR WORKS - KLM/56 - VARIOUS REPAIRS IDENTIFIED IN DETAILED EXAMINATION REPORT DATED 03.02.23.‡National Highways · £52,373
- HRE - CLOSED BRANCH LINES MINOR WORKS - EVP/3 - HANDHELD GPR TRIAL AND REPEATABLE LIDAR SURVEY OF TUNNEL‡National Highways · £36,373
- CLOSED BRANCH LINES MINOR WORKS - LAD/5 - REMOVE GIANT HOGWEED AND TREAT TO PREVENT REGROWTH - JULY 2023 THOUGH TO MAY 2026‡National Highways · £14,512
- CLOSED BRANCH LINES MINOR WORKS - KLO/26 - REMOVE WATERBORNE DEBRIS TRAPPED AGAINST VIADUCT PIERS‡National Highways · £14,330
- M20 Moveable Barrier Permanent Solution Stage 2 (via CCS RM6088)‡Highways England · £30,525,344
- Public Buildings Construction and Infrastructure‡LHC for the Scottish Procurement Alliance (SPA) · shared by 22 suppliers, up to £750,000,000 in total · runs until Apr 2027
From contract award notices on Contracts Finder (since 2016) and Find a Tender (since 2021), published by the Cabinet Office under the Open Government Licence v3.0. Values are as published by the buyer and usually cover the whole contract term; the total leaves out awards shared between several suppliers, where the published figure is a ceiling for all of them, placeholder values and single figures of £1 billion or more. Notices marked ‡ do not state a company number and were linked by an exact match on the registered name. Contracts below the publication thresholds and those of devolved buyers that publish elsewhere are not included.
History
3 events- Financial year endedAccounts filed at Companies House
- Balfour Beatty Group Limited registered as a person with significant control
- Company incorporatedPrivate limited company
Dates as recorded at Companies House: incorporation, name changes, officer appointments and resignations, current persons with significant control, and the end of each financial year with figures in the database. Former persons with significant control are not listed.